images/pol-pl.gif

List of projects

YEAR

PROJECT

TONAGE (TON)

2008

Crane for Karup

9,0

2008

Pedestrian bridge Roskildevej

46,4

2008

Roof girders for Dyssegaardsskolen

20,2

2008

Demag Crane

13,4

2008

Building steel for Kedelsmedien

69,2

2008

Bridge for Gantriss

27,2

2007

Copenhagen Airport

600,0

2007

Pedestrian Bridge Koge

47,2

2007

Pedestrian Bridge over Aagade

300,0

2007

Steel frames

26,0

2007

Connecting building for Copenhagen Airport

12,0

2007

Motoring 3, IPE columns

89,0

2007

Motoring 3, light masts

97,5

2007

Norrebro Halls

49,1

2007

Portals

31,4

2006

Tower Structure

24,7

2006

Motoring 3, portals for signs

40,0

2006

Copenhagen Airport

33,0

2006

Aalborg Portalnd

180,2

2006

Svanemollevaerket

100,0

2006

Motoring 3

750,0

2006

Cross beams

85,2

2005

Tank Sheltr

42,8

2005

3 small houses

42,8

2005

Building structure Esbjerg

26,2

2005

Girders, Esbjerg

77,2

2005

Screen and gangways

20,0

2004

Spray drying plant

50,0

2004

Beams

184,9

2004

Internal Parts

80,0

2004

Passenger gangways

52,6

2004

Stair Tower

31,2

2004

Holmen Bridge

87,0

2004

Slurry Preheater

28,9

2004

Footbridge

46,0

2004

Thule Airbase

12,7

2004

Reno Nord Enterprise 2

155,2

2004

Reno Nord – steel structure and equipment

165,0

2004

Beams

304,2

2004

Pressure tanks

 

2004

8 cranes

83,7

2003

Classens Bridge

48,5

2003

Internal Parts

160,0

2003

Crane for FLS

14,7

2003

Auditorium

380,0

2002

Crane for Vestas

25,0

2002

Lillebealt Bridge

140,0

2002

Benin Bridge

320,0

2002

Crane for Energy E2

33,5

2002

Path Bridge

27,0

2002

Swimming pool Nuuk Greenland

33,7

2002

Outfitting Steel

120,0

2002

Vanlose Metro Station

44,6

2002

Strut covering

240,0

2002

Crane for Berlin

25,3

2002

Flis

131,3

2001

Top Units

880,0

2001

Farum Park

37,7

2001

Daglosensundet Bridge

153,0

2001

Klaralven Bridge

306,0

2001

Thule Airbase

20,7

2001

LSG Lufthansa

150,0

2001

Novo NF II

375,2

2001

LSG Lufthansa

99,6

2001

Bridge for Hellerupvej

100,0

2000

Parken Stadion

1.400,0

2000

Billund Airport

1.200,0

2000

Nordex Energi Cranes

12,0

2000

Masts for Farum Park

102,0

Aagade Path bridge in Copenhagen

Steel structure was executed in 6 sections and after trail assembly in the workshop the bridge was delivered on site in Copenhagen. Due to placing the bridge in the center of Copenhagen, erection of the structure had to be very quick and it took 40 hours from 48 hours planned for this job.

Parameters

Client: Barlsund A/S
Start date:03/08/2007
End date:28/03/2008
Weight: 300 ton

Photo gallery

Audytorium, Opera House in Copenhagen

Audytorium in Opera House in Copenhagen is very complilcated structure consists thousand elements and required high precision of execution.

Parameters

Client: E. Pihl & Søn A.S.
Start date:01/07/2002
End date:01/07/2003
Weight: 380 tons

Photo gallery

Path Bridge in Svenborg

It is one of many pedestrian bridges with antislip layer produced by Polish manufacturer. Scope of work contained fabrication of steel structure with surface treatment and aplication of antyslip treatment.

Parameters

Start date:02/08/2002
End date:30/09/2002
Weight: 27 tons

Photo gallery

Strut Covering

The girders supporting "reinforced" wall in exit from metro station Islands Brygge in Copenhagen.

Parameters

Client: Ørestadsselskabet I/S
Start date:29/05/2002
End date:30/08/2002
Weight: 240 tons

Photo gallery

Parken Stadion

Steel structure of the roof for National Stadion "Parken" in Copenhagen.

The structure contained 13 bolted, spatial, pipe girders with span of 94 m and weight of 35 tons each. All girders were trail assembled in the workshop. Parken Stadion after closing the roof was at that time European's largest heated room. Inauguration took place in May 2001 in connection with the Eurovision Song Contest.

Parameters

Client: Skanska A/S
Start date:01/09/2000
End date:28/02/2001
Weight: 1.400 tons

Billund Airport

Steel structure for Billund Airport – Cargo Terminal, it was one of the first structures produced in Poland.

Parameters

Start date:13/09/2000
End date:06/10/2001
Weight: 400 tons